Coordination of Architectural Concepts and Construction Systems
Abstract
Keywords
References
Akintola Akintoye, Eamon Fitzgerald, 1995, Design and build: a survey of architects' views, Engineering, Construction and Architectural Management J, Vol. 2 Iss: 1, pp.27 - 44
Atkinson, 1999,Project Management: Cost, Time and Quality, Two Best Guesses and A Phenomenon, It’s Time to Accept Other Success Criteria, Int’l Journal Project Management, 17(6), 337-342.
Anonym, “Getting Value for Money from Construction Projects through Design”, NATIONAL AUDIT OFFICE/NAO (Commission of Architecture Building Environment/CABE, Organization of Government Commerce/OGC).
Habraken, N.J., 1972, An Alternative to Mass Housing, Praeger Publisher.
Haponava Tatsiana and Saad Al-Jibouri, 2010, "Establishing influence of design process performance on end-project goals in construction using process-based model", Benchmarking: an International Journal, Vol. 17 Iss: 5, pp.657 – 676.
Liu and Walker,1998, Evaluation of Project Outcomes, J Constr Mngt Econm, 16(2), 209-219.
Morris Hicky Morgan, 1960 (Memon, 2007), The Ten Books On Architecture. Dover Publication
Neale RH and Neale DE, 1989, Project Management: Construction Planning, Thomas Telford HQ London
Newcombe, 2000, The Anatomy of Two Projects: A Comparative Analysis Approach, Int’l Journal of Project Management, 18(3), 189-199.
Xiao.H and Proverbs, 2001, . Xiao and D. Proverbs, "The performance of contractors in Japan, the UK and the USA," International Journal of Quality & Reliability Management, vol. 19, pp. 672-687, 2002.
Refbacks
- There are currently no refbacks.
International Conference on Engineering and Technology Development (ICETD)
Bandar Lampung University
ISSN: 2301-5690